My Roof CRM

Measurements explained: snapshots, active and Quote-Safe

The mental model behind roof measurements: where numbers come from, what a snapshot is, why only one is active, and how measurements reach a quote without silently changing it.

Intermediate 6 minOwner / manager, Sales rep / estimator, Office & admin staff· Last checked 2026-10-03

Video tutorial coming soon

The written steps below are complete. Producing the video? Use the video script tab — it follows these steps one for one.

Rough runtime

3:19

Scenes

6

Lesson

4.1 · Roof measurements

File name

04-01 measurements-explained.mp4

Before you record

  • A job with two snapshots: one imported and active, one finalized manual drawing.
  • Record at 1920×1080, browser zoom 100%, light theme, sidebar expanded, no personal data on screen. See Recording standards.

Shot list

#TimeSceneScreenOn screenNarration
00:0020sIntro: Measurements explained: snapshots, active and Quote-Safe/projects/[projectId]Title card, then the first screen of the lesson.Before we import or draw anything, two minutes on how measurements work in My Roof CRM, because the words snapshot, active and Quote-Safe come up everywhere.
10:2041sFind measurements on the job/projects/[projectId]Open a job and look at the "Roof measurements" card on the right.Every job has a Roof measurements card. Empty at first, and once a snapshot is active it shows the numbers every quote on this job will use.
21:0141sUnderstand snapshots/projects/[projectId]/settingsClick "Measure manually" (or the "Measurements" header button). In the workspace, open the Snapshots tab in the "Measurement details" sidebar.A snapshot is one saved set of numbers. Drafts are editable, finalized ones are frozen, and the one marked Active is the one quotes read. Switching the active snapshot is one click, and it is reversible.
31:4241sUnderstand Quote-Safe/projects/[projectId]/settingsLook at the confidence badge in the top bar: "Draft", "Needs Review" or "Quote-Safe".Quote-Safe is the app checking your drawing: facets, pitch, scale, edges all labelled, nothing overlapping. Only a Quote-Safe drawing can be finalized, so a half-finished sketch can never price a job.
42:2341sUnderstand how quotes react/projects/[projectId]Remember this rule: when the active snapshot changes, proposals on the job show "Measurements changed. Refresh quote lines before sharing." and the quote editor offers "Review changes". Nothing changes until you click Apply.And the most important rule: new measurements never change a quote silently. You get a warning, you review the new quantities, you apply. Until then, the old numbers stand and sharing is blocked.
53:0415sRecap & next lesson/projects/[projectId]Hold on the finished result, then the end card.With the model clear, let us import an aerial report, the fastest way to get numbers on a job.

Narration, in order

  1. 0. Intro: Measurements explained: snapshots, active and Quote-Safe

    0:00 · 20s

    Title card, then the first screen of the lesson.

    Before we import or draw anything, two minutes on how measurements work in My Roof CRM, because the words snapshot, active and Quote-Safe come up everywhere.

  2. 1. Find measurements on the job

    0:20 · 41s

    Open a job and look at the "Roof measurements" card on the right.

    Every job has a Roof measurements card. Empty at first, and once a snapshot is active it shows the numbers every quote on this job will use.

    Show before cutting: Either "No measurements yet…" with "Import EagleView / RoofScope" and "Measure manually", or a summary of Pitch, Roof area, Squares, Ridges, Hips, Valleys, Eaves, Rakes and Waste from the active snapshot.

  3. 2. Understand snapshots

    1:01 · 41s

    Click "Measure manually" (or the "Measurements" header button). In the workspace, open the Snapshots tab in the "Measurement details" sidebar.

    A snapshot is one saved set of numbers. Drafts are editable, finalized ones are frozen, and the one marked Active is the one quotes read. Switching the active snapshot is one click, and it is reversible.

    Show before cutting: Each snapshot shows "Snapshot vN", Active or not, Finalized or Draft, "Updated …" and "Saved by …". Finalized snapshots that are not active have an "Activate" button.

  4. 3. Understand Quote-Safe

    1:42 · 41s

    Look at the confidence badge in the top bar: "Draft", "Needs Review" or "Quote-Safe".

    Quote-Safe is the app checking your drawing: facets, pitch, scale, edges all labelled, nothing overlapping. Only a Quote-Safe drawing can be finalized, so a half-finished sketch can never price a job.

    Show before cutting: Finalize is disabled until the drawing is Quote-Safe: at least one valid facet, a pitch between 0 and 24, a scale above zero, every edge classified, and no overlapping facets.

  5. 4. Understand how quotes react

    2:23 · 41s

    Remember this rule: when the active snapshot changes, proposals on the job show "Measurements changed. Refresh quote lines before sharing." and the quote editor offers "Review changes". Nothing changes until you click Apply.

    And the most important rule: new measurements never change a quote silently. You get a warning, you review the new quantities, you apply. Until then, the old numbers stand and sharing is blocked.

    Show before cutting: Sharing a proposal is blocked while the warning is present.

  6. 5. Recap & next lesson

    3:04 · 15s

    Hold on the finished result, then the end card.

    With the model clear, let us import an aerial report, the fastest way to get numbers on a job.

Related lessons

Finished this lesson?